Pat21idn
Answered

IDNStudy.com, ang iyong platform para sa mga sagot ng eksperto. Ang aming komunidad ay nagbibigay ng eksaktong sagot upang matulungan kang maunawaan at malutas ang anumang problema.

It takes peter 6 hours longer than luis to do a certain job. Together they do it in 4 hours. How long would it take each working alone to do the job?

Sagot :

Luis' work rate: 1/x  (where x is the time it takes for Luis to do the same job.)
Peter's work rate: 1/x+6   (where x+6 is the time it takes for Peter to do the 
                                              same job)
Combined work rate:  1/4    (where 4 is the number of hours it will take if
                                              they work together.)

Equation:
1/x  +  1/x+6 = 1/4

LCD: (4)(x)(x+6)

Multiply each term by (4)(x)(x+6):
1(4)(x)(x+6)  +  1(4)(x)(x+6)  =  1(4)(x)(x+6)
      x                         x+6          4

(4)(x+6) + (4)(x)  = (x)(x+6)
4x + 24 + 4x = x² + 6x
8x + 24 = x² + 6x

Quadratic equation:
x² + 6x - 8x - 24 = 0
x² - 2x - 24 = 0

Solve by factoring:
x² - 2x - 24 = 0
(x - 6) (x + 4) = 0

x - 6 = 0             x + 4 = 0
x = 6                  x = -4 

Choose the positive root, x = 6
Substitute 6 to x in work rate:
Luis: 1/x   ⇒   1/6  ⇒   6 hours
Peter:  1/x+6  ⇒  1/6+6  =  1/12  ⇒    12 hours