A. evaluation B. objectives C. procedure D. materials .he ask how to much his project in industrial arts cost in which part of project plan does he need to check?​


Sagot :

Answer:

a.evaluation po yan po ang tamang sagot

Answer:

He need to check the materials.

The answer is D