Petpetidn
Answered

IDNStudy.com, ang iyong mapagkukunan para sa malinaw at maaasahang mga sagot. Sumali sa aming platform upang makatanggap ng mabilis at eksaktong tugon mula sa mga propesyonal sa iba't ibang larangan.

The number of day it takes to complete a construction job varies inversely as the number of men assigned to do the job. If it takes 3 months for 30 men to complete the house construction project, how long would it take for 50 men to do the job?



Sagot :

construction job = k divided by number of men (k=constant of variation)
let c = construction job,
     n = number of men
     x be the unknown

3 = k/(30) ; k = 90
so, x = 90/50
x = 1.8

50 men takes 1.8 months to do the job..