Makahanap ng mga solusyon sa iyong mga problema gamit ang IDNStudy.com. Hanapin ang mga solusyong kailangan mo nang mabilis at madali sa tulong ng aming mga eksperto.

the number of days (d) needed to paint the wall varies jointly as the width (w) of the wall and inversely as the number of people (p) painting on it. It takes 6 days for 3 person to paint a 9-meter width of the wall. How many days will it take 4 person to paint 18 meters width of the wall?​