IDNStudy.com, kung saan ang mga eksperto ay sumasagot sa iyong mga tanong. Ang aming mga eksperto ay handang magbigay ng malalim na sagot at praktikal na solusyon sa lahat ng iyong mga tanong.

the number of days (d) needed to paint the wall varies jointly as the width (w) of the wall and inversely as the number of people (p) painting on it. It takes 6 days for 3 person to paint a 9-meter width of the wall. How many days will it take 4 person to paint 18 meters width of the wall?​