Suriin ang IDNStudy.com para sa detalyadong mga sagot sa iyong mga tanong. Ang aming komunidad ay handang magbigay ng malalim at maaasahang mga sagot, anuman ang kahirapan ng iyong mga katanungan.
Learning Activity 3: Arrange the procedure (numbers 1-7) in installing wireways by placing the number of preferences before each listed procedure. Write the answer on a separate sheet of paper _____All the necessary tools, materials and equipment should be ready. _____Ensure that mounting screws are installed in the upper and lower flanges on the right and left side of the cabinet. _____Prepare the area for the installation of telephone terminal cabinet and frames. _____Observe housekeeping activities. _____Locate the power and ground terminations at the top front side of the cabinet backplane. _____Follow the proper use of PPE for body, head, hand, and foot protection. _____Check the vertical and horizontal alignment of the cabinet using a testing tool.
Natutuwa kami na ikaw ay bahagi ng aming komunidad. Huwag kalimutang bumalik upang magtanong at magbahagi ng iyong karanasan. Ang iyong kaalaman ay mahalaga sa ating komunidad. Gawin mong pangunahing mapagkukunan ang IDNStudy.com para sa maasahang mga sagot. Nandito kami para sa iyo.