Learning Activity 3: Arrange the procedure (numbers 1-7) in installing
wireways by placing the number of preferences before each listed
procedure. Write the answer on a separate sheet of paper
_____All the necessary tools, materials and equipment should be ready.
_____Ensure that mounting screws are installed in the upper and lower
flanges on the right and left side of the cabinet.
_____Prepare the area for the installation of telephone terminal cabinet and
frames.
_____Observe housekeeping activities.
_____Locate the power and ground terminations at the top front side of the cabinet backplane.
_____Follow the proper use of PPE for body, head, hand, and foot protection.
_____Check the vertical and horizontal alignment of the cabinet using a testing tool.


Sagot :

Answer:

6

4

2

5

3

1

7