IDNStudy.com, ang iyong platform para sa mga sagot ng eksperto. Hanapin ang mga solusyong kailangan mo nang mabilis at tiyak sa tulong ng aming mga bihasang miyembro.
PROJECT PROPOSAL ON BROILER PRODUCT Instructions: 1. Prepare a simple project proposal with cost estimate of materials needed, cost of labor including schedule of activity to complete the project by computing gathered Data in Broiler Production. 2. Please take note that you will use the current price prevailing in the locality, compute the expected outputs and gain. See and be guided by the listed items below for your computation 3. Assuming that the duration of the construction is 5 days, and you need to hire two (2) laborers, make a computation of the total labor cost, including the detailed scope of works using the schedule of activity below. 4. Submit your project proposal to your teacher for checking and recording purposes. ITEMS FOR COMPUTATION 1. EXPENSES 1. Cost of 105 heads of "day-old chicks" at P-------- each P--- 2. Cost of feeds --- 2.1---- kilograms of booster at P------ per kg. 2.2- kilograms of starter at P ----- per kg. 2.3 - kilograms of finisher at P ------- per kg. 3 Cost of vaccines and supplements ------- 4. Cost of light and heat P------ 5. Cost of water P- 6. Others P- (this include labor cost = P300/day) II. RECEIPTS FROM SALES per kg Р 1. Total sale of kg. (live weight) at 2. Sale of empty bags of feeds at P 3. Sale of bags of manure at P Р per bag per bag Р
Sagot :
Natutuwa kami na ikaw ay bahagi ng aming komunidad. Magpatuloy sa pagtatanong at pagbibigay ng mga sagot. Sama-sama tayong lumikha ng isang mas matibay na samahan. Ang IDNStudy.com ay laging nandito upang tumulong sa iyo. Bumalik ka palagi para sa mga sagot sa iyong mga katanungan.