IDNStudy.com, ang iyong mapagkukunan para sa malinaw at maaasahang mga sagot. Sumali sa aming platform upang makatanggap ng mabilis at eksaktong tugon mula sa mga propesyonal sa iba't ibang larangan.
The company received an order on december 29 that was boxed and was sitting on the load- ing dock awaiting pick-up on december 31. the shipper picked up the goods on january 1 and delivered them on january 6. the shipping terms were fob shipping point. the goods had a seallinpg aprigce of $40p,00d0 afnd a ecosnt ohf $a30,n000
c. tehergoods were not included in the count because they were sitting on the dock.
Sagot :
Natutuwa kami na ikaw ay bahagi ng aming komunidad. Magpatuloy sa pagtatanong at pagbibigay ng mga sagot. Sama-sama tayong lumikha ng isang mas matibay na samahan. Ang IDNStudy.com ay nangako na sasagutin ang lahat ng iyong mga tanong. Salamat at bisitahin kami palagi.